AEDO BP344 Compliance Audit Checklist ← All Standards

19 Sections · 170+ Checkpoints · Amended IRR 2024

Interactive BP344
Compliance Audit Checklist

Work through every accessibility checkpoint required under the Amended IRR of BP344 — ramps, stairs, parking, toilets, signage, tactile systems, and more. Your progress is saved automatically on this device. When you're done, download a personalized PDF audit report.

0 / 170 reviewed (0%)
0 compliant 0 non-compliant

Project Information

Sign-Off

Inspecting On-Site?

Download a blank, printable version of this same 19-section checklist — with your project details above pre-filled — so an engineer can walk the site and tick items by hand.

Need a Licensed Engineer to Verify Your Audit?

AEDO Construction provides on-site BP344 accessibility compliance review, architectural plans, and structural design for Philippine construction projects.

Get a Free Estimate